Substation Status

Geumo Substation

100MVA in Haenam, Jeollanam-do

Hamgumi Substation

100MVA in Yeonggwang, Jeollanam-do

Duu-ri Substation

240MVA in Yeonggwang, Jeollanam-do

Moha Solar Substation

100MVA in Sinan, Jeollanam-do

Janggam Solar Substation

120MVA in Sinan, Jeollanam-do

T&Dochon Substation

120MVA in Yeongju, Gyeongsangbuk-do

Muan Switching Station

400MVA in Muan, Jeollanam-do

Hamgumi Switching Station

400MVA in Yeonggwang, Jeollanam-do

Transmission Line Status

Haenam Geumo Energy

  • Location Haenam-eup, Haenam-gun, Jeollanam-do to Hanjari, Hwansan-myeon
  • Connection Point KEPCO Haenam Substation
  • Power Supply Voltage 22.9kV
  • Transmission Line Extension 14km underground

Moha Solar, Sinan

  • Location Hyeongyeong-myeon, Muan-gun, Jeollanam-do to Jido-eup, Sinan-gun
  • Connection Point KEPCO Unnam Substation
  • Power Supply Voltage 154kV
  • Transmission Line Extension 13km underwater, 4km underground

Duu-ri, Yeonggwang

  • Location Yeonggwang, Jeollanam-do
  • Connection Point KEPCO Yeonggwang Substation
  • Power Supply Voltage 154kV
  • Transmission Line Extension 10km underground

Hamgumi, Yeonggwang

  • Location Yeonggwang, Jeollanam-do
  • Connection Point KEPCO Yeonggwang Substation
  • Power Supply Voltage 154kV
  • Transmission Line Extension 14km underground